About

One team from design to handover

Interium brings architecture, interior design, construction, renovation, furniture and real estate together in one company. The client signs one contract and deals with one team.

specialists in the team
30+
services in one contract
6
month warranty after handover
24

How we work

Most renovation problems appear when the work is split between several contractors: the designer draws one thing, the builder does another, and the furniture maker measures for the third time. When something goes wrong, everyone points at someone else.

We have brought this chain into one team. Architects and designers prepare the project, the construction department carries it out, procurement delivers materials on time, and furniture is made to measure. The project lead is the same person from start to finish.

Each stage is signed off separately, concealed work is photographed before it is closed, and the estimate is open line by line. The client follows progress through a personal link and a live camera.

Team

Architecture and design

Architects and interior designers: layout, 3D visuals, working drawings, designer supervision.

Construction and renovation

Engineers, site managers and craftsmen: all execution from demolition to finishing.

Procurement and logistics

Selecting, ordering and delivering materials to site on time.

Sales and client service

First meeting, measurement, proposal and contract, then ongoing contact throughout the work.

Legal and finance

Contracts, documentation, payment schedules and reporting.

Our principles

Open estimate

The price of every job and material is shown on its own line.

Staged sign-off

Payments are tied to stages, and each stage is signed off with you.

Online tracking

A personal link and live camera show the work at any moment.

One responsibility

Design, construction and furniture are in one contract, with one party accountable.

Warranty

No handover until the snag list is closed, then a 24-month warranty.

Join our team

We are always open to meeting architects, designers, engineers, craftsmen and project managers. Send your CV and portfolio by email or message us on WhatsApp.

Company details

Legal name
INTERIUM LLC
Tax ID (VÖEN)
3105468681
Registered address
Apt. 21, 30 H. Aliyev Ave., Khirdalan, Absheron district
Office
Yasamal district, Mustagillik street (Kristal Park Yasamal complex), Baku
220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement