Design, architecture, construction and renovation company in Baku
City Garden, Narimanov: classic kitchen, interior design, Baku
220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Interior design, architecture and turnkey renovation in Baku

Design, architecture, construction and renovation company in Baku

Scroll

Portfolio

Selected projects

In numbers

projects currently in progress
48
month warranty (after handover)
24
measurement and first consultation
0₼
204 m² apartment in Bayil: kitchen and living area, interior and exterior design, Baku
220 m² apartment in Bayil: entrance hall and wardrobe, architecture and planning, Baku
City Garden, Narimanov: classic kitchen, turnkey renovation, Baku
220 m² apartment in Bayil: entrance hall and wardrobe, construction, Baku
Marble bathroom, furniture, Baku
220 m² apartment in Bayil: entrance hall and wardrobe, real estate, Baku

Transparency

Follow your renovation from your phone and a live camera

After signing the contract we send you a personal link. You see which stage the work is at, what is finished and who to contact. Through the same link you can connect to the live camera and see the work with your own eyes at any moment. No need to call or come over.

  • Watch the work on a live camera at any time
  • Each stage is signed off separately
  • Concealed work is photographed before it is closed
  • Payments are tied to stages
14:32●●●
INTERIUMSample

Apartment renovation

Yasamal, 95 m²

Progress58%
Live camera: 220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku Live camera Live now
  1. ✓Start of renovation (demolition)12 September
  2. ✓Rough works (electrics, plumbing, plaster)18 October
  3. Finishing (tiles, flooring, painting)in progress
  4. Furniture and equipment installationnext
  5. Handover

At this stage: project manager

Questions

Have a question? Here are the answers

How is the cost of interior design calculated?

The price of a design project depends on the area (m²) and the scope: layout only, full 3D visuals, or with working drawings. We give an exact written quote after seeing the property.

Is the measurement and first meeting paid?

No. We come to the property, take measurements, note your requirements and give an initial consultation. This is free.

How long do design and renovation take?

A design project for an apartment usually takes 2-4 weeks, and turnkey renovation 3-7 months depending on the area and scope. Custom furniture takes 3-6 weeks to make. The exact schedule is set in the contract.

Can I order only design or only renovation?

Yes. Our process is modular: you can order just a design project, renovation based on another studio's design, or only furniture. When one team does everything, responsibility is not split.

How can I follow the renovation?

After signing the contract you receive a personal tracking link. At any time you see which stage the work is at and who to contact at that stage. Through the same link you can connect to the live camera and watch the work in real time. Each stage is signed off separately.

Do you give a warranty?

Yes. We do not hand over until the snag list is closed. A 24-month warranty starts once the handover certificate is signed.

What does renovation cost per m²?

It depends on the condition of the property, the scope of work and the materials, so we do not quote one number for everyone. After a free measurement we give a line-by-line estimate with the price of every job and material.

Do you build houses and villas?

Yes. We build private houses and villas, as well as restaurants, cafes, offices and gyms, with one team from design to handover.

Do you renovate restaurants, cafes and offices?

Yes. We also design, renovate and furnish commercial spaces, and plan the work around the business's operating hours.

Do you make custom and upholstered furniture?

Yes. We make, assemble and install kitchen furniture, wardrobes, bedroom and children's furniture, bathroom furniture, sofas and armchairs to measure.

Do you sell houses and apartments?

Yes. We also sell renovated apartments, ready-built houses, premium apartments and villas. Call or message us on WhatsApp for the current list.

Where do you work?

In every district of Baku, in Absheron and in the regions of Azerbaijan: Sumgait, Ganja, Guba, Gabala, Shaki, Lankaran and other cities. We come to you for the measurement.

Address

Visit our office

Yasamal district, Mustagillik street (Kristal Park Yasamal complex)
Baku, Azerbaijan

Call or message before you come, and we will meet you with materials and finished projects.

Mon–Fri 09:00–18:00, Sat 09:00–13:00, Sun closed
+994 50 260 70 70

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement