Interior design in Baku: apartments, villas, offices

A design project for an apartment, house, villa, office, restaurant or cafe, from measurement to working drawings. You see the result in photorealistic 3D before any work starts.

Interior design in Baku: apartments, villas, offices

Interior design in Baku: comfortable to live in, buildable in renovation

Good interior design starts with a beautiful picture, but it does not end there. The project has to fit your daily life: who stands where in the kitchen in the morning, where clothes are stored, how the lights come on in the evening, how the children's room will change in a few years. That is why we start the design not from a style but from your habits and the real dimensions of the rooms.

At Interium the designer, architect, renovation team and furniture workshop work together. The price and availability of every material you see in the visuals is checked in advance, and the drawings are prepared in the format the builders work from. As a result the project does not stay on paper: when renovation is finished the rooms look like the visuals, and the budget is known before work starts.

What is included

  • Site visit, measurement and a written brief
  • Layout: zoning, furniture placement, lighting and electrical plan
  • Photorealistic 3D visuals of every room from several angles
  • Selection of materials, colours, furniture and sanitary ware, with an exact list of everything chosen
  • Working drawings: walls, ceilings, floors, electrics, plumbing, furniture
  • Designer supervision during construction

Projects we design

  • Apartments: 1, 2, 3, 4 bedroom and penthouses
  • Houses and villas, exteriors and facades
  • Kitchens, living rooms, bedrooms and children's rooms
  • Bathrooms and toilets
  • Offices, showrooms and shops
  • Restaurants, cafes, salons and gyms

Styles

Contemporary, minimalist, neoclassical, classic, loft, Scandinavian and art deco. We choose the style around your lifestyle and budget rather than a template, and price the materials early so the design looks the same after renovation as it does on paper.

How long it takes

An apartment project usually takes 2-4 weeks. For large houses, villas and commercial spaces the timeline depends on the area and the number of options; we give a written schedule after measurement.

Exterior

For houses, villas and commercial buildings we design the facade, entrance, terrace and garden layout in the same style as the interior.

Design and budget

A design project helps you control the renovation budget. Once the materials list is ready, the estimate is calculated from exact quantities rather than guesses. Decisions such as using an expensive material only where it is visible and choosing a more affordable alternative elsewhere are also made at the design stage, not during renovation.

What you receive

At the end of the project you receive a complete album: plans, 3D visuals, working drawings and the materials list. It comes in electronic and printed form, and during renovation the builders take every dimension and every material from it.

How a design project is made: 7 steps

  1. Getting to know you and the brief

    At the first meeting we note who lives in the home, your daily habits, the styles you like and dislike, the budget and when you plan to start renovation. This list becomes the key document for the whole project.

  2. Measurement on site

    The designer visits the property and measures the walls, window and door openings, ceiling height and the existing electrical and plumbing points. The measurement is free.

  3. Layout

    We prepare several layout options showing the zones, furniture placement and circulation. We choose one together and make any changes needed.

  4. Concept and 3D visuals

    For the chosen layout we define the style, colours and materials, and show every room from several angles in photorealistic 3D. We keep working on the visuals until you approve them.

  5. Materials and furniture

    We prepare an exact list of tiles, parquet, paint, doors, sanitary ware, lighting and furniture, with product codes and quantities. With this list the budget is clear before renovation starts.

  6. Working drawings

    The documents the builders work from: dimensioned plans, wall elevations, ceiling, floor, electrical, plumbing and furniture drawings. When the drawings are precise, nothing is left to be "figured out on site".

  7. Designer supervision

    During renovation the designer visits the site, checks that the work follows the project and answers the builders' questions. That way the result looks like the visuals.

Questions

Interior design in Baku: apartments, villas, offices: questions

What is included in a design project?

Measurement, layout, 3D visuals of every room, a materials and furniture list, and working drawings. Designer supervision during renovation can also be ordered. We list the contents of the project line by line in the contract.

How long does a design project take?

An apartment project usually takes 2-4 weeks. For houses, villas and commercial spaces the timeline depends on the area and the number of options; we give a written schedule after measurement.

How is the cost of interior design calculated?

It depends on the area (m²) and the scope: layout only, full 3D visuals, or a package with working drawings. We give an exact written quote after seeing the property, and the measurement is free.

Can I start renovation without a design project?

You can, but changes later cost more. At minimum you need a layout and an electrical plan so sockets, lights and plumbing points end up in the right places.

Do you also carry out the renovation after the design?

Yes. Design, renovation and furniture are done by one team. You can also order the design project on its own.

Is remote design possible?

Yes. For clients living abroad or in another city, we take the measurements, hold meetings online and send 3D visuals and drawings electronically.

Does a small apartment need a design project too?

In a small space every centimetre counts and mistakes show sooner. With a proper layout we place storage, lighting and furniture so the apartment looks larger and works comfortably.

Can the visuals be changed?

Yes. We review the visuals with you and make changes to colours, materials and furniture until you approve them. The terms for revisions are set out in the contract.

Where we work

We work in Baku, Absheron and every region of Azerbaijan. We come to you for the measurement and the first meeting.

  • Yasamal
  • Nasimi
  • Narimanov
  • Sabail
  • Khatai
  • Nizami
  • Binagadi
  • Khazar
  • Sabunchu
  • Surakhani
  • Garadagh
  • Bayil
  • Badamdar
  • Bilgah
  • Mardakan
  • Shuvalan
  • Buzovna
  • Novkhani
  • Masazir
  • Khirdalan
  • Sumgait
  • Ganja
  • Guba
  • Gusar
  • Gabala
  • Shaki
  • Shamakhi
  • Lankaran
  • Mingachevir

Selected projects

View all
220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement