Turnkey renovation in Baku

One team from demolition to finishing. The estimate is open line by line, every stage is signed off separately, and you follow progress from your phone and a live camera.

Turnkey renovation in Baku

What turnkey renovation means

With turnkey renovation you hand the property over to us empty or in its old condition, and we return it ready to live in: lines installed, walls and floors finished, sanitary ware, doors and lighting fitted, rooms clean. You do not need to look for separate tradespeople, carry materials yourself or manage the order of the work.

In Baku we work in black frame and white frame apartments in new buildings, in older buildings, houses, villas and offices. Every property follows the same rule: measurement and estimate first, then the contract, then work in stages with each stage signed off together with you.

What is included

  • Demolition and removal of construction waste
  • Electrical and plumbing lines, heating and air conditioning routes
  • Plastering, skimming, painting, decorative plaster
  • Floors: levelling layer (screed), tiles, parquet, laminate
  • Suspended ceilings, drywall structures and concealed lighting
  • Installation of doors, furniture, sanitary ware and appliances

Types of renovation

  • Apartment renovation in new buildings (bare shell or pre-finished) and older apartments
  • House and villa renovation
  • Bathroom and toilet renovation, tiling
  • Kitchen renovation together with kitchen furniture
  • Room renovation: bedroom, living room, children's room
  • Full renovation and light refresh renovation
  • Office, shop, restaurant, cafe and gym renovation

Demolition

We remove old tiles, screed, plaster, partition walls, plumbing and wiring, and take the waste away the same day. We work without touching load-bearing structures, without disturbing the neighbours and within the building's working hours.

Timeline and control

Apartment renovation usually takes 3-7 months depending on the area and scope, and cosmetic repairs take a few weeks. Concealed work is photographed before it is closed, each stage is signed off with you, and payments are tied to stages.

Warranty

There is no handover until the snag list is closed. A 24-month warranty starts once the handover certificate is signed.

Together with design and furniture

When the design project, renovation and made-to-measure furniture come from one team, electrical and plumbing points are placed to fit the furniture, materials are bought from the project list, and no corrections are needed later.

New buildings: white frame and black frame

A black frame apartment has only walls and windows, so renovation starts from scratch: lines, plaster, screed and all the finishing. In a white frame apartment part of this work has already been done by the developer. We check it first, fix any poor-quality areas and continue the renovation from there.

One team, one point of responsibility

Builders, site manager, procurement and project manager are all in one company. Materials arrive on time, jobs do not wait on each other, and you know who to call when you have a question. If the design and furniture are ours too, the dimensions and points match the project.

How turnkey renovation works: 7 steps

  1. Free measurement and inspection

    We visit the property, measure it, check the condition of the walls, floors and electrical and plumbing lines, and note your wishes and budget.

  2. Estimate and contract

    We prepare a line-by-line estimate: every job and every material is shown separately with quantity and price. The schedule, stages and payment terms are set out in the contract.

  3. Demolition and preparation

    Old finishes, partitions and lines are removed and the waste is taken away. Windows, doors and the building's common areas are protected from dust and damage.

  4. Rough work

    Electrical, plumbing, heating and air conditioning routes are laid, partitions are built, walls are plastered and screed is poured on the floor. Concealed work is photographed and signed off with you before it is closed.

  5. Finishing

    Tiles and parquet are laid, suspended ceilings are installed, walls are skimmed and painted, and decorative plaster and concealed lighting are done.

  6. Installation

    Doors, sanitary ware, light fittings, furniture and appliances are installed, and every system is tested in working order.

  7. Handover and warranty

    We walk through the property together and draw up a snag list; once everything is fixed and the final cleaning is done, the handover certificate is signed. The 24-month warranty starts from that moment.

Questions

Turnkey renovation in Baku: questions

How is the renovation cost calculated?

It depends on the area, the condition of the property, the scope of work and the materials chosen. After a free measurement we prepare a line-by-line estimate showing the price of every job and material.

Do you renovate white frame and black frame apartments in new buildings?

Yes. A black frame apartment is handed over as a bare shell, just walls and windows, so we do everything from scratch. In a white frame apartment the plaster, floor levelling and utility lines are already done, so we check them and continue from where it makes sense.

Can I order only a bathroom or kitchen renovation?

Yes. We also renovate single bathrooms, toilets, kitchens or rooms, and the measurement is still free.

Who buys the materials?

Your choice. We can buy and deliver the materials, with each price shown in the estimate, or you can buy them yourself and we give you the list and quantities.

How can I follow the renovation?

After signing the contract we send you a personal tracking link. You see the stages and who to contact, and you can connect to the live camera.

How long does apartment renovation take?

A full apartment renovation usually takes 3-7 months depending on the area and scope, and a light refresh takes a few weeks. We give the exact schedule together with the estimate and put it in the contract.

Can I live at home during renovation?

For a full renovation we do not recommend it: dust, noise and occasional water and power cuts make daily life hard, and the work slows down. For a light renovation we can work room by room and protect the part of the home you live in.

What does the warranty cover?

The warranty covers the work we have done: for 24 months after handover we fix any defects related to workmanship. The warranty terms are set out in the contract.

Where we work

We work in Baku, Absheron and every region of Azerbaijan. We come to you for the measurement and the first meeting.

  • Yasamal
  • Nasimi
  • Narimanov
  • Sabail
  • Khatai
  • Nizami
  • Binagadi
  • Khazar
  • Sabunchu
  • Surakhani
  • Garadagh
  • Bayil
  • Badamdar
  • Bilgah
  • Mardakan
  • Shuvalan
  • Buzovna
  • Novkhani
  • Masazir
  • Khirdalan
  • Sumgait
  • Ganja
  • Guba
  • Gusar
  • Gabala
  • Shaki
  • Shamakhi
  • Lankaran
  • Mingachevir

Selected projects

View all
220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement