Construction

From private houses and villas to restaurants, cafes, offices and gyms. We combine design, construction, renovation and furniture in one contract and hand over a building ready to use.

Construction

House, villa and commercial construction in Baku and Absheron

Building a private house or villa is a long, multi-stage job: land, design, foundation, frame, roof, facade, utilities, interior finishing and furniture. When each stage goes to a separate contractor, the schedule stretches, the budget scatters and nobody takes responsibility for mistakes.

Interium carries out construction from design to keys under one contract. The architect, engineer, site manager, procurement and renovation team are in the same company. Every construction stage appears on a separate line of the estimate, payment is tied to the sign-off of that stage, and you follow progress through a personal link and a live camera. We work in Baku, in Absheron's country house settlements and in the regions.

What we build

  • Private houses and villas
  • Country houses, summer houses and holiday homes
  • Restaurants, cafes and bars
  • Office buildings and office spaces
  • Gyms, fitness and wellness centres
  • Shops, showrooms and other retail spaces

What is included

  • Plot analysis and siting of the building
  • Architectural and structural design, line-by-line estimate
  • Earthworks, foundation, frame, walls and roof
  • Facade, windows, electrics, water, sewerage, heating and ventilation
  • Interior finishing, interior design and made-to-measure furniture
  • Landscaping: fencing, paths, terrace

Why one team

When the designer, building contractor, finishing crew and furniture maker are separate, every mistake gets passed from one to another. We handle the design, construction and interior work ourselves, so schedule and budget are managed in one place.

Transparency

The estimate is open line by line, payments are tied to stages, and concealed work is photographed before it is closed. You follow construction progress through a personal link and a live camera.

How long it takes

The timeline depends on the floor area, number of floors, complexity of the design and the season. Weather is also taken into account for the foundation and frame. Once the project and estimate are ready, we set out the exact schedule stage by stage in the contract.

Quality control

At the end of each stage an engineer checks the work against the project: dimensions, reinforcement, plumb walls, layer thicknesses. Work that will be closed up is photographed and signed off together with you. We do not move on to the next stage until the current one is accepted.

Construction in stages

You can also build the black or white frame first and do the interior work later. In that case a separate estimate and schedule are prepared for each stage, and the building is protected until the next stage.

Grounds and landscaping

Along with the building we plan the grounds: fence and gate, paths and parking, terrace, planting and lighting. The landscape design follows the same style as the building, and its estimate is prepared separately.

Commercial buildings

When building a restaurant, cafe, office, gym or shop, we plan not only the building itself but also the kitchen area, ventilation, electrical capacity and guest and staff flow in advance. We hand over the space with its interior and furniture, ready to open.

Construction stages: from bare land to keys

  1. Site visit and requirements

    We visit the plot, take measurements and check the terrain, access and utilities. The number of rooms, floors and the budget are written down.

  2. Design and estimate

    The architectural and structural design is prepared, and on that basis a line-by-line estimate and a staged work schedule are drawn up.

  3. Earthworks and foundation

    The site is cleared, excavation is carried out and the foundation is built to the design. The reinforcement and dimensions are checked before the foundation is closed.

  4. Frame, walls and roof

    The frame, floor slabs, walls and roof are built. At this stage the shape and volume of the building become fully visible.

  5. Facade, windows and utilities

    The facade cladding, windows and doors are installed, and electrical, water, sewerage, heating and ventilation lines are run.

  6. Interior finishing, design and furniture

    Plastering, screed, tiling, flooring, ceilings and painting are done, and made-to-measure furniture is produced and installed.

  7. Handover and warranty

    The snag list is closed, the building is cleaned and handed over ready to use. The warranty starts after the handover certificate.

Questions

Construction: questions

How is the cost of construction calculated?

It depends on the floor area of the building (m²), the number of floors, the structural solution and the materials chosen. Once the project is ready we give a line-by-line estimate, and payments are tied to stages.

What is the difference between black frame, white frame and turnkey construction?

A black frame is the building's foundation, frame, walls and roof. A white frame adds the facade, windows, utilities and rough interior work. With turnkey construction the building is handed over with finishing and furniture, ready to live or work in.

How can I follow the construction?

Through a personal tracking link you see the stages, photos and schedule, and you can connect to the live camera. Each stage is signed off with you.

Do you give a warranty on construction?

Yes. The warranty starts once the handover certificate is signed; its length and terms are set out in the contract.

How long does it take to build a villa?

It depends on the area, number of floors and the design. We put the exact schedule in the contract once the project and estimate are ready.

Can you build a restaurant or cafe from scratch?

Yes. The space design, kitchen layout, ventilation, electrics, interior, furniture and finishing all come from one team.

Do you build outside Baku?

Yes. We work in Baku, Absheron and every region of Azerbaijan.

Do you build from an existing project?

Yes. We review your project, complete it if needed and build from it.

Where we work

We work in Baku, Absheron and every region of Azerbaijan. We come to you for the measurement and the first meeting.

  • Yasamal
  • Nasimi
  • Narimanov
  • Sabail
  • Khatai
  • Nizami
  • Binagadi
  • Khazar
  • Sabunchu
  • Surakhani
  • Garadagh
  • Bayil
  • Badamdar
  • Bilgah
  • Mardakan
  • Shuvalan
  • Buzovna
  • Novkhani
  • Masazir
  • Khirdalan
  • Sumgait
  • Ganja
  • Guba
  • Gusar
  • Gabala
  • Shaki
  • Shamakhi
  • Lankaran
  • Mingachevir

Selected projects

View all
220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku