
Architecture and planning
From the architectural design of a house or villa to replanning an apartment and the concept of a commercial space. When the plan is right, both the interior and the construction become simpler.

Architectural design in Baku: from plan to construction
Before building a house or villa, most of the time should be spent on the plan. When the room layout, the orientation of windows, the position of the stairs and the building services are resolved correctly once, both construction and later renovation are faster and cheaper. A wrong plan causes discomfort for years and is expensive to change.
We prepare the architectural project together with the construction budget. Whether it is a plot in one of Absheron's country house settlements or an apartment or commercial space in Baku, every project is built around the real conditions of the site, your requirements and the cost of construction. Because the team that designs the project can also build it, there is no gap between the drawings and the execution.
What we do
- Private houses and villas
- Replanning of apartments and houses
- Facades, exteriors and 3D visualisation
- Design of restaurants, cafes, offices, gyms and shops
- Siting the building on the plot and site planning
- Architectural and structural working documents, quantities for the estimate
How we work
First we survey the plot or building and write down your requirements and budget. Then we prepare several layout options; the chosen one is developed in 3D and turned into working documents. We design with the construction budget in mind so the solution on paper can be built at a realistic cost.
From design to construction
The team that designs the project also builds it. There is no gap between drawings and execution, changes are resolved on site and responsibility stays in one place.
What we focus on in a house design
- Placing rooms for sunlight and views
- Separating everyday and guest areas
- Storage, technical room and garage
- Comfortable stairs, corridors and passages
- Thermal insulation and energy saving
- Room for future extension
Choosing a plot
If you have not bought the plot yet, we can look at it together before you buy: size and shape, terrain, access road, proximity of utilities and neighbouring buildings. This shows in advance what kind of house can be built on the plot and roughly what construction will cost.
Apartment replanning
We prepare replanning projects to join the kitchen with the living room, create an extra bedroom or walk-in closet, or enlarge the bathroom. Every change is checked technically first: the rules on load-bearing walls, ventilation shafts and wet areas are not broken.
How long it takes
A concept for a house or villa usually takes 2-4 weeks, and full working documents take 1-3 months depending on the size. Apartment replanning is prepared faster. We give a written schedule once the brief is agreed.
Stages of an architectural project
Site visit and initial data
We study the plot dimensions, the terrain, neighbouring buildings, access road and the location of utilities. For an existing building we measure it fully and draw up a plan of its current state.
Design brief
The number and size of rooms, floors, garage, terrace, pool, technical rooms and the budget are set out in one document. The project is built around this brief and checked against it at every stage.
Sketch and concept
We prepare several plan and massing options, taking into account how the building sits on the plot and the sun and wind directions. We choose one together.
Facade and 3D
For the chosen option we develop the facade, windows, roof shape and facade materials, and show the building in 3D visualisation.
Working project
We prepare the architectural plans, sections and facades, the structural part covering foundation, frame and roof, and the main drawings for building services.
Quantities and budget
We take off the quantities of the main materials from the project, so the construction estimate is based on real figures rather than guesswork.
Architect supervision
During construction the architect visits the site, checks that the work follows the project and resolves questions that come up on site.
Questions
Architecture and planning: questions
What is included in an architectural project?
Site analysis, plan and massing options, facade design and 3D visualisation, architectural and structural working drawings, and quantities of the main materials. If needed, architect supervision is also provided during construction.
How is the cost of the project calculated?
It depends on the total floor area of the building (m²) and the scope: concept only or a full working project. We give an exact written quote once the brief is agreed.
How long does a house project take?
A concept for a house or villa usually takes 2-4 weeks, and full working documents take 1-3 months depending on the size.
Do you build from an existing project?
Yes. We build and renovate from other architects' projects too. If needed, we review the project first and complete any drawings missing for construction.
Can an apartment be replanned?
Non-load-bearing walls can be changed. During measurement we identify which walls are safe to touch and plan accordingly.
Can I build a house without a project?
We do not recommend it. Without a project, the structure, utilities and room layout are decided on site, so mistakes and extra costs increase. Even for a simple house, plans, sections and a structural part make construction faster and cheaper.
Can you design to a budget?
Yes. We write the budget into the brief from day one and discuss every option together with its construction cost. Because we take off quantities at the design stage, there are fewer unexpected costs later.
Do you design commercial buildings too?
Yes. We design restaurants, cafes, offices, gyms and shops: zones, guest and staff flow, kitchen and technical rooms, and the interior are resolved in one project.
Where we work
We work in Baku, Absheron and every region of Azerbaijan. We come to you for the measurement and the first meeting.
- Yasamal
- Nasimi
- Narimanov
- Sabail
- Khatai
- Nizami
- Binagadi
- Khazar
- Sabunchu
- Surakhani
- Garadagh
- Bayil
- Badamdar
- Bilgah
- Mardakan
- Shuvalan
- Buzovna
- Novkhani
- Masazir
- Khirdalan
- Sumgait
- Ganja
- Guba
- Gusar
- Gabala
- Shaki
- Shamakhi
- Lankaran
- Mingachevir
Selected projects
View all
Contact
Let's talk about your project
Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.
