220 m² apartment in Bayil: entrance hall and wardrobe
- Year
- 2026
- Area
- 220 m²
- Category
- Apartment
- Scope
- Interior design · 3D visuals
- Location
- Bayil, Baku
- Materials
- Decorative plaster, Black marble texture, Slatted panels, Matt fronts, Walnut, Concealed LED
About the project
The entrance area of a 220 m² apartment in the Kristal Tower complex. The hall has a coat system with a bench and open shelves, a tall built-in wardrobe and a mirrored console. Walls are finished in textured decorative plaster and the floor in a dark marble texture. Concealed lighting in the stepped suspended ceiling makes the narrow hall feel wider.


