Marble bathroom

Year
2026
Area
10 m²
Category
Apartment
Scope
Interior design · 3D visuals
Location
Baku
Materials
Marble, Bronze mixer, Illuminated mirror, Slatted fronts, Concealed LED

About the project

A warm-toned marble design for a 10 m² bathroom. The basin is carved as a single stone block, with a wall-hung vanity with slatted fronts below. Concealed lighting is set into the mirror frame and under the vanity. The mixer and accessories are bronze.

Contact us
Marble bathroom, interior design, Baku

More projects

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement