White frame vs black frame: what is the difference and where to start

When you view an apartment in a new building in Baku, the seller always asks: white frame or black frame (ağ karkas or qara karkas)? These two words change both the scope of the renovation and the budget.

White frame vs black frame: what is the difference and where to start

What a black frame is

A black frame apartment is the rawest state you can buy. The building has its walls, ceiling and concrete floor slab, there is an entrance door and usually windows. Apart from that, there is almost nothing.

The walls are not plastered, so the brick or block is bare. The floor is bare concrete. Electrical wiring is not run inside the apartment, or there is just one distribution box at the entrance. Water and sewage pipes stop at the riser (the vertical pipe that runs through every floor of the building) and are not taken into the rooms.

In short, a black frame is an empty box. You build everything yourself from scratch.

What a white frame is

With a white frame the developer goes one step further. The walls are usually plastered and screed is poured on the floor. Screed is a cement layer poured over the slab to level it, and tiles or laminate are laid on top of it. Electrical cables and water pipes are taken into the rooms, and sometimes socket positions are prepared too.

But "white frame" does not mean the same thing on every site. One developer gives you only plaster and screed, another also runs the electrics. So have the contract list exactly what is included, line by line.

Which one works out better

At first glance a white frame looks convenient: part of the work is already done. In practice, though, part of that finished work often has to be torn out again.

Say you want to move the kitchen to another wall. In a white frame the water and drain pipes are already run to the old spot, so they have to be removed and run again. Or the plaster has been applied unevenly, you cannot just paint over it, and the wall has to be straightened again.

A black frame does not have this problem. You do everything once, to your own plan. So if you have a design project or want to change the layout, a black frame is often the better choice.

What to check before buying a white frame

If you are buying a white frame, checking the quality of the finished work saves money. Put a long metal ruler against the wall: big gaps underneath mean the plaster is not flat. Tap the screed with your knuckle: a hollow sound means it has not bonded underneath and may crack over time.

Ask what cable the electrics were run with. Thin cable may not cope later with an air conditioner, an oven or a water heater. If the pipe joints are visible, look at them: rust or damp marks are a bad sign.

Where to start the renovation

In both cases the first step is the same: plan first, work second. Which room is for what, where the furniture will stand, where you need sockets and lights. When this is not decided on paper, the tradesman does it his own way, and later a socket ends up behind a wardrobe.

Then whatever needs removing is removed, electrics and water lines are run, walls are straightened and screed is poured. This is called the "rough work". The finishing work, meaning tiles, paint, flooring and doors, comes after that.

At Interium the first measurement visit is free. We come to the apartment, look at its condition and tell you on the spot what in a white frame can be kept and what has to be redone.

Questions

Questions

What is already done in a white frame?

Usually the walls are plastered, screed is poured on the floor, and electric and water lines are taken into the rooms. But it depends on the developer, so have the list written into the contract.

Is renovating a black frame more expensive?

There is more work to do, but nothing finished has to be torn out and redone. If you plan to change the layout, the final total often comes out close.

Can I check the quality of a white frame myself?

You can do simple checks: how flat the walls are, whether the screed sounds hollow, what the pipe joints look like. For a more thorough look, call a tradesman or us, the visit is free.

More articles

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku