Look closely at the portfolio
Pictures can look great, but a 3D render and a finished, handed-over project are not the same thing. Ask whether the project was actually built or exists only as a visual. If possible, ask to see a finished site or to talk to a past client.
Look for work similar to yours: an apartment for an apartment, a villa for a villa. A team that does a good small kitchen will not necessarily run the construction of a large house just as well.
The estimate should be line by line
A price "per square metre" is only a starting point. A good estimate lists every job and every material separately: quantity, unit price and total. With an estimate like that you can compare two companies fairly.
Also ask what the estimate does not include. Demolition, waste removal, material delivery and installing plumbing fixtures and lights are often charged separately.
What the contract should say
- The list of works and the estimate, attached to the contract
- Stages and the duration of each stage
- Payment schedule: in parts as work progresses, not everything up front
- Who buys materials and at whose expense
- How prices are agreed when something changes
- How long the warranty lasts and what it covers
- Each side's responsibility for delays
One team or several contractors
When one studio does the design, another crew the renovation and a third workshop the furniture, everyone points at someone else when a problem appears. With design, renovation and furniture in one company, responsibility sits in one place and there is less gap between the drawings and the real work.
Working with separate contractors is possible too. You will just have to manage the order of the work and the sign-offs yourself.
How you will follow the work
Ask whether each stage is signed off separately, how progress is reported and who is in charge on site. Hidden work, such as wiring and plumbing inside the walls, should be shown to you and photographed before it is closed up.
At Interium the client follows the current stage through a personal link and signs off each stage separately.
Questions to ask at the first meeting
- Who will do the work: your own staff or subcontractors?
- Who will be in charge on site and how do I reach them?
- In which cases can costs go beyond the estimate?
- Where do you buy materials, and can I see the receipts?
- If a defect appears after handover, how quickly and how will you fix it?