Staying at home during a renovation, and how to make it bearable

Everyone asks it: can I renovate without renting somewhere else or moving out? You can, but not with every renovation and not at every stage. Knowing what to expect makes a big difference.

Staying at home during a renovation, and how to make it bearable

The honest answer first

With a light refresh, such as painting walls, replacing floors or updating doors, staying at home is usually possible. It is a bit uncomfortable, but life goes on.

A full renovation is a different story. While walls are being taken down and cut open and the wiring and pipes are being replaced, the apartment is effectively a building site. Living there at that stage is exhausting and not good for your health.

What works best for most people is the middle way: stay somewhere else during the dirtiest and noisiest weeks, then move back in while the finishing work is going on.

Dust is the biggest problem

Building dust is not like ordinary dust. Cutting walls and sanding plaster creates very fine dust that gets under doors and through vents into every room. You can wipe it off, but an hour later it is back.

A few simple things help. Seal the doorway of the room being worked on with thick plastic sheeting and tape the edges. Wrap furniture and bedding in plastic film rather than covering them with a throw. Pack clothes into closed bags. Wipe with a damp cloth every evening instead of sweeping, because a broom just lifts the dust back into the air.

If you have children, elderly relatives or someone with allergies at home, it is better for them to stay elsewhere on the dustiest days.

Noise, water and power

Hammer drills and cutting tools run during the day and the noise fills the whole apartment. If you work from home, plan another place to work on those days.

When the water pipes and wiring are replaced, water and power have to be switched off for a few hours, sometimes for a whole day. While the bathroom is being renovated, the shower and toilet may be out of use. Agree with the contractor in advance which days you will be without water and when the power will be off. Just knowing makes life much easier.

Renovating room by room

People who want to stay at home often renovate in stages. For example, the bedrooms are finished first, the family moves in there, and then work starts on the living room and kitchen.

The downside is that the whole project takes longer. The team does not do the same job across the whole apartment at once, but starts and finishes each room separately. Some work cannot be split by room at all: wiring and pipes are laid for the whole apartment in one go.

Often the most comfortable option is to keep one room as a clean zone where you sleep, and do everything else in turn. While the kitchen is being renovated, a small electric hob and a table in that room work as a temporary kitchen.

What to move out beforehand

It is best to take valuables, fragile items, documents and electronics somewhere else. Renovation is stressful for pets too: the noise frightens them, and they might run out of an open door or get into building materials. If friends can look after them for those weeks, that is ideal.

Do not forget the neighbours. Telling them in advance when the noisy work will start and putting a short note up at the entrance prevents a lot of conflict. If the building has rules about working hours, sticking to them is easier for everyone, including you.

Questions

Questions

At which stage of a renovation is it best to move out?

During demolition, cutting into walls and laying new wiring and pipes. That is when there is the most dust and noise, and water and power are cut most often.

Can I renovate one room at a time?

Yes, but the overall timeline gets longer. Wiring and pipes are still laid for the whole apartment at once.

Does building dust damage furniture?

Fine dust gets into fabric and upholstered furniture. It is better to wrap furniture in plastic film or take it out of the room being worked on.

More articles

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement