Why lighting needs to be planned early
The complaint we hear most often goes like this: "The renovation is finished, but the place just doesn't feel right in the evening." Usually it is the lighting. One lamp in the middle of the ceiling, chopping vegetables in your own shadow in the kitchen, getting out of bed to switch off the light by the door.
All of this is solved at the very start, before the wiring goes in. A cable is laid into the wall once, then plastered and painted over. Adding a light or a switch later means cutting into the wall again.
Three kinds of light
A well lit room usually has three kinds of light. The first is general light: it lights the whole room evenly, it is what you switch on when you come home at night. The second is task light: above the kitchen worktop, over a desk, next to a mirror. It is there for a specific job and needs to be bright.
The third is decorative or mood light: hidden lighting along a wall, an LED strip inside a shelf, a wall lamp. It does not light the room, it gives it depth and warmth. In the evening in front of the TV it is nice to switch off the main light and keep only this one on.
Warm and cool light, simply explained
Bulb boxes show numbers like "2700K" or "4000K". That is the colour of the light. A lower number means a yellowish, warm light, like evening sun or an old incandescent bulb. A higher number means a white, cool light, the kind you find in offices and hospitals.
Bedrooms and living rooms feel more comfortable with warm light, it is easier on the eyes. For the kitchen worktop, the bathroom mirror and a desk, neutral white is better because it shows colours accurately. The main rule: do not mix bulbs of different colours in one room, or it will look patchy.
Where switches and sockets should go
A switch belongs on the side the door opens, next to the handle, not behind the door. It sounds obvious, but it is a common mistake. In the bedroom a second switch by the bed is a real comfort: you turn the light off without getting up. A long corridor needs a switch you can use from both ends.
Choose socket positions after the furniture. First decide where the bed, sofa, TV and desk will go, then place the sockets to suit. In the kitchen make sure there are enough sockets above the worktop for the kettle, toaster and blender, so you are not hunting for an extension lead every time.
Put the plan on paper
Draw a simple plan of each room and place the furniture on it. Then ask yourself: what do I do here in the evening? Read, cook, watch TV, work? For each activity, mark where the light will come from.
Add the small things to the plan as well: a dim night light in the corridor, a light inside the wardrobe that comes on when the door opens, a separate socket on the balcony. They seem minor, but you will use them every day.
Your electrician needs this plan too. Without one, lights get installed "the usual way", and you are the one who lives with it. Half an hour with a sheet of paper buys years of comfort.
How we handle it
In a design project we prepare the lighting and electrical plan together with the furniture layout, so every light, switch and socket has its place on the drawing. The crew works from that plan, which is why sockets do not end up behind a wardrobe after the renovation.



