Plan first
This is the cheapest stage and the one most often skipped. Which room is for what, where the bed and the TV go, which corner the fridge stands in. Without knowing this, the electrician puts the sockets "where they usually go".
You do not necessarily need a big design project for this. At the very least you need a simple sketch of where the furniture goes and an electrical plan: where the sockets, switches and light points will be.
Demolition
In an older apartment everything that is not needed comes out first: old tiles, old flooring, sometimes partition walls, old pipes. The rubbish should be taken away straight away, because when it piles up in the apartment it gets in the way of the next jobs.
Before knocking down a wall, always find out whether it is load-bearing. A load-bearing wall carries the weight of the building and must not be touched.
Demolition is noisy work. Find out the building's working hours and talk to the neighbours in advance, it heads off a lot of arguments later. If there is a lift, think about how you will protect it while the rubbish is carried out.
Rough work: everything that ends up inside the walls
Most of what is done at this stage will not be visible later, but it is exactly what decides the quality of the renovation. Electrical cables are run inside the walls, water and drain pipes are put in place, and pipes and cables for air conditioning are prepared in advance.
Then the walls are plastered and screed is poured on the floor. Screed is a cement layer that levels the floor. Laminate or parquet must not go on top until it has fully dried, otherwise the floor can lift later.
One tip: before the walls are closed up, photograph the cables and pipes together with measurements. Later, when you hang a shelf or a picture, you will know exactly where not to drill.
Getting walls and ceilings ready for paint
After plaster, the walls get filler (şpaklyovka). This is a thin, smooth layer applied over the plaster so the paint sits evenly. Ceilings often use drywall: gypsum boards fixed to metal profiles, which make it easy to hide cables and lights behind them.
Checking whether a wall is flat is not hard. Hold a long straight ruler or profile against it and look at the gap. When light falls from the side, for example from a lamp in the evening, even small waves show up, so check in that kind of light.
This stage cannot be rushed. Every layer has to dry. When paint goes over damp filler, cracks appear a few months later.
Finishing work and installation
Next come tiles, flooring, paint and doors. Sanitary ware, lights and furniture go in last. Furniture should not be brought in before painting: dust and paint marks spoil it quickly.
There is also an order between tiles and flooring. Usually wall tiles go first, then the floor. Laminate and parquet are left for the very end, because they are the coverings most sensitive to scratches and water.
Handover
When the tradesman says "it is done", do not rush. Walk through the whole apartment with him in daylight. Open and close every door, plug a device into every socket, turn on the taps and watch how the water drains. Shining a torch along a wall from the side shows unevenness and marks much better.
Write down every defect you find and photograph it if you can. Do not make the final payment until that list is closed. It is not a sign of distrust, it is simply the normal way the job is done.
A few words about time
How long a renovation takes depends on the condition of the apartment, its size and the scope of work, so it would not be honest to give everyone the same figure. One thing is certain, though: when the order is kept, the job finishes sooner. When one stage is delayed, for example the tiles arrive late, every job after it waits.
So choose your materials in good time. Knowing your tiles, flooring, doors and sanitary ware when the renovation starts makes life easier for both you and the tradesmen.