What a kitchen is made of
Kitchen makers and sellers use a few words that are worth knowing, they make choosing easier. The carcass is the body of the cabinet: its sides, bottom and shelves. The fronts are the cabinet doors, and they mostly decide how the kitchen looks. The worktop is the surface on top where you chop and cook. Hardware (fittings) means the metal parts: hinges (the joint that connects the door to the cabinet), handles, drawer runners and lift-up mechanisms.
Each is chosen separately, and cutting corners on each one has a different result.
The carcass: you do not see it, but it holds everything
The carcass is usually made of laminated board: a panel pressed from wood particles and covered with a thin decorative layer. Its main weakness is water. When a cut edge of the board is left open, water soaks in and the board swells.
So pay special attention to the cabinet under the sink. The edges should be sealed with a solid edge band, and ideally the bottom of this cabinet should be made of a water-resistant material. In practice, the first cabinet to fail is almost always the one under the sink.
The doors
The doors are the "face" of the kitchen and the choice here is wide. MDF (a dense board pressed from wood fibre) is smooth and comes in any colour when it is painted or wrapped in film. Acrylic looks glossy and modern. Natural wood veneer (a thin sheet of real wood) gives a warm look, but it can change colour slightly in sunlight.
Glossy surfaces are beautiful, but fingerprints and scratches show on them sooner. If you have small children or cook a lot, a matt surface is easier to live with day to day.
The worktop
The cheapest option is a laminated board. But you cannot put a hot pan straight on it or cut on it with a knife, and around the sink it can swell over time.
Quartz (engineered stone) stands up well to daily use: it does not stain and wipes clean easily. Natural stone such as marble is very beautiful, but acidic things like lemon, vinegar and wine can mark it. If you choose this kind of stone, choose it knowing that.
Mechanisms: do not save here
Many people spend money on the doors and the stone and save on the hinges and runners. A year later a door sags and a drawer sticks. Yet these are exactly the parts that work hardest in a kitchen.
For wall cabinets you can choose doors that lift up instead of swinging sideways. They do not hit your head and do not get in the way when open, but their mechanism has to match the weight of the door.
Soft-close hinges and runners stop doors from slamming and make the furniture last longer. In the showroom, ask to open and close a fully loaded drawer, you will feel the quality straight away.
Before measuring
Kitchen furniture is measured after the walls are straightened and the electric and water points are in place. Choose the appliances, meaning the oven, fridge and dishwasher, in advance: the furniture is drawn around their sizes.
We make and install kitchens to measure ourselves. After measuring we show you several material options side by side with their prices, so you can see the difference and choose.



