Kids room: how to plan it so you are not redoing it every year

Children grow fast and their rooms rarely keep up. With a little thinking ahead, the same room can work from the baby years to school age.

Kids room: how to plan it so you are not redoing it every year

Safety first

To a child, the bedroom is a climbing frame. That is why tall wardrobes and shelving must be fixed to the wall. If a child pulls out a drawer and stands on it, an unsecured wardrobe can tip over. It is the simplest job in the room and the most important one.

Fit covers on the sockets, choose furniture with rounded corners, and put a lock on the window that a child cannot open. For the floor, pick something non-slip, warm and easy to clean: children spend a lot of time playing on the floor.

Where the toys will live

Mess in a kids room usually is not the child's fault, it happens because things have no place of their own. A child can only put a toy back where they can reach. So low shelves, open boxes and drawers on wheels work better than a tall wardrobe with doors.

  • Bottom: everyday toys the child takes out and puts away on their own
  • Middle: books and drawing supplies
  • Top: seasonal clothes and things you rarely need

Desk and light

As school approaches, the desk becomes the main spot in the room. Put it by the window so daylight comes from the side. If your child writes with the right hand, the light should come from the left, otherwise the hand casts a shadow on the page.

The desk needs its own lamp, the ceiling light alone is not enough. A height-adjustable desk and chair "grow" with the child, so you will not need to replace them for several years.

The bed and the night

Try not to put the bed under the window or next to the radiator: it gets cold there in winter and hot in summer. The best spot is against a wall with a view of the door, but not directly opposite it. A child who wakes up and can see the door feels calmer.

Night lighting matters too. For a child who gets up at night to go to the toilet, a soft light at floor level or a small lamp with a switch by the bed makes life much easier. Add a blackout curtain as well: summer mornings start early, and there is no need for your child to wake up with the sun.

Furniture that changes with the child

Buying a cot, then a child's bed, then a teenage bed is expensive and tiring. Extendable beds, a changing table that later becomes an ordinary chest of drawers and modular wardrobes with movable shelves make furniture last much longer.

The same logic applies to walls. Cartoon characters on the wallpaper will look babyish to your child in a couple of years. A calm background is the safer choice, with character coming from things that are easy to swap: cushions, a rug, pictures, wall stickers.

Let your child have a say

A kids room belongs to the child. You do not need to let them choose everything, but offer a choice between two or three options: which of these two colours, which of these two lamps. In a room they helped choose, children go to bed more willingly and tidy up more willingly too.

We make kids room furniture to measure: low shelves, wardrobes fixed to the wall, parts that can be changed later. We show the project in 3D first, so your child can see their room before it is built.

More articles

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement