The plot
Before buying land, or at least before starting to build, take a good look at it. Is the plot sloping or flat, are there water, power, gas and sewage lines nearby, where does rainwater run. In some parts of Absheron groundwater is close to the surface, and this affects how the foundations are built.
Make sure in advance that the documents are in order and find out about the permits needed for construction. This saves a lot of headaches later.
And look at the sun. Which way will the living room and terrace face, which room will heat up most in summer. Knowing this before the design makes the house both more comfortable and cheaper to run.
The design
When a house is built "by eye", the house you had in mind and the house that comes out are often different. The architectural design sets the layout, the look, where the windows go and how big the rooms are. The structural part works out how the house will stand: foundations, columns, beams.
Think about the utilities at the design stage too: where the boiler room will be, where the air conditioners go, which way the sewage runs. Breaking through a wall later always costs more.
Foundations, walls, roof
Before building starts, the site is cleared and the position of the house is marked out precisely on the ground. This small-looking job matters: if the house shifts by a few centimetres, the distances to the fence, the road and the neighbouring plot change.
The foundation is the part that carries the weight of the house down into the ground, and its type is chosen according to the soil. This is no place to save: when the foundation is wrong, cracks appear in the walls and they are very hard to fix.
Then come the frame, meaning the supporting skeleton of the house, the walls and the roof. Until the roof is on the house is not protected from rain, so it is good to plan this stage around the season. Once the roof is closed, working inside becomes much easier.
Utilities and facade
Once the house is a "closed box", the windows go in and the water, power, gas, sewage and heating lines are run. The facade, meaning the outer finish of the walls, is there both for looks and to keep the heat in. When insulation is fitted properly, less goes on heating in winter and on air conditioning in summer.
Interior work and handover
From here the work is similar to an apartment renovation: walls, floors, bathrooms, kitchen, furniture. The difference is that the area is larger and everything has to be ordered on time. Windows, doors and furniture take time to make, and when they are ordered late the whole build waits for them.
How to keep control from a distance
Most owners cannot come to the site every day. Some live in another city or abroad altogether. In that case two things help: splitting the work into stages and closing each stage with documents and photos.
For example, before the foundation is poured, the rebar, meaning the steel bars placed inside the concrete, is photographed. Before the walls are plastered, the cables and pipes are photographed. Later none of this will be visible, but you will still have it.
When the design, the construction and the interior work are given to one team, the schedule and the budget are managed in one place. With us you follow the build through a personal link and a live camera, and concealed work is photographed before it is closed up.