New build or older apartment: what to look at before you buy

Anyone looking for an apartment in Baku ends up asking this. Both options have their advantages, but some of the costs are not visible at first glance.

New build or older apartment: what to look at before you buy

Why a new build is tempting

In a new building everything is new: the lift, the pipes, the windows. Layouts are modern, the kitchen and living room can often be combined, and the rooms are brighter.

But new build apartments are usually sold as a white frame or black frame, meaning either with no finishing at all or with only plaster and a levelled floor. So on top of the purchase price comes the cost of a full renovation. You should not decide without working that out.

What an older apartment offers

Older buildings are often in central, established neighbourhoods with schools, markets and transport close by. The walls are thick and let less sound through. You can see the neighbours and know how the building lives.

Sometimes an older apartment is sold already renovated and you can move in straight away. But this is where you need to be careful.

Where hidden costs are

The biggest surprise in an older apartment is inside the walls. Under fresh paint and laminate there may be old wiring and rusty pipes. Replacing them means opening up the walls, in other words breaking the renovation that looks so good.

Do a few simple checks at the viewing. Open the electrical panel: if you see old screw-in fuses, the wiring is old too. Look behind the bathroom tiles and into the ceiling corners, since yellow stains are traces of leaks. Turn on the taps and check the water pressure and colour.

In a new build the hidden cost lies elsewhere, in the build quality. How straight the walls are, how well the windows are fitted and how the pipe joints were made all affect your renovation budget later.

The layout and the building

When you view an apartment, think about your future life, not just the rooms. If you want to enlarge the kitchen or combine rooms, find out which walls are load-bearing. Those cannot be touched, and that may limit your plans.

Look at the building itself as well: the entrance, the stairs and lift, the roof and basement, the shared pipes. In an older building these are every resident's problem, and they will become yours.

A few words about documents

Whichever apartment you choose, have the documents checked before you buy: who owns the property and whether there are any debts or restrictions on it. With a new build, also find out how reliable the developer is and what stage the building is at. The safest way is to do this with an experienced lawyer or notary.

One simple question

Ask yourself what matters more: moving in quickly, or setting everything up your way? If you need to move in fast, an older apartment in good condition may be the better deal. If you want to build your home from scratch to your own plan, a new build fits better.

At Interium we view the property with you before you buy, check its technical condition and give you an approximate renovation budget. That way you decide with the full picture, not just the price of the apartment.

More articles

220 m² apartment in Bayil: entrance hall and wardrobe, interior design, Baku

Contact

Let's talk about your project

Measurement and the first consultation are free. Fill in the form, call or message us on WhatsApp. We reply the same day.

Free measurement